Back to Launches
Success
Human Exploration

Space Shuttle Atlantis / OV-104 | STS-129

Space Shuttle
Nov 16, 2009, 7:28 PM UTC
Nov 16, 2009, 7:28 PM UTC
Mission Elapsed Time
T-00:00:00

Mission Details

STS-129 (ISS assembly flight ULF3) was a NASA Space Shuttle mission to the International Space Station (ISS) flown by Atlantis. STS-129 focused on staging spare components outside the station. The 11-day flight included three spacewalks. The payload bay carried two large ExPRESS Logistics Carriers holding two spare gyroscopes, two nitrogen tank assemblies, two pump modules, an ammonia tank assembly, a spare latching end effector for the station's robotic arm, a spare trailing umbilical system for the Mobile Transporter, and a high-pressure gas tank. STS-129 was the first flight of an ExPRESS Logistics Carrier.

Type
Human Exploration
Orbit
Low Earth Orbit (LEO)
Programs
Space Shuttle, International Space Station

Launch Site

Pad
Launch Complex 39A
Location
Kennedy Space Center, FL, USA
Country
🇺🇸 USA